June 28, 2023 News
Work has largely wrapped up at the City of Dayton’s Total Phosphorus Treatment Project!
The project was designed to facilitate NPDES Nutrient Removal Compliance with the addition of a new Chemical Feed System to be piped to the existing aeration process. This new system includes 7 ea Chemical Bulk Storage Tanks, associated pumps and piping and new chemical delivery infrastructure. Due to additional solids processing needs and the age of the current Diffused Air Floatation (DAF) Tanks, the project scope was also designed to include removal and replacement of the 4 ea DAF Tanks with 4 ea Rotary Drum Thickeners, an associated Polymer System and new Thickened Waste Activated Sludge Pumps. °µÍø½ûÇø phased the construction of this project to prioritize the plant’s operations in the existing building.
I Build America - Ohio features °µÍø½ûÇø Laborer, Mike Brey
September 20, 2024News
Volunteering at the Licking River Round Up
September 20, 2024Mission
I Build America - Ohio features °µÍø½ûÇø's Caleb Arnold
September 19, 2024News
°µÍø½ûÇø Celebrates Award Wins at 2024 Cogence Alliance Town Hall
September 18, 2024Awards
Project Spotlight: Robin Industries
September 17, 2024News
°µÍø½ûÇø raises awareness on Suicide Prevention
September 16, 2024News
°µÍø½ûÇø gives back to dementia community
September 13, 2024Mission
Manchester LSD Celebrates New High School
September 11, 2024News
We hope to see you at the 2024 Cogence Alliance Town Hall
September 10, 2024News
OWEA Buckeye Bulletin features °µÍø½ûÇø's Global Mission Trip Program
September 9, 2024Mission
Living our Mission: August 2024 Project Outreach
September 5, 2024Mission
Mid-Atlantic Team Outing: RushHour Karting
September 4, 2024News