June 28, 2023 News
Work has largely wrapped up at the City of Dayton’s Total Phosphorus Treatment Project!
The project was designed to facilitate NPDES Nutrient Removal Compliance with the addition of a new Chemical Feed System to be piped to the existing aeration process. This new system includes 7 ea Chemical Bulk Storage Tanks, associated pumps and piping and new chemical delivery infrastructure. Due to additional solids processing needs and the age of the current Diffused Air Floatation (DAF) Tanks, the project scope was also designed to include removal and replacement of the 4 ea DAF Tanks with 4 ea Rotary Drum Thickeners, an associated Polymer System and new Thickened Waste Activated Sludge Pumps. °µÍø½ûÇø phased the construction of this project to prioritize the plant’s operations in the existing building.
Volunteering at St. Vincent de Paul - Dayton, OH
June 2, 2023Mission
Take a Sneak Peek inside Dayton Metro Library's newest branch
May 31, 2023News
John Cleveland Wins 2023 °µÍø½ûÇø Core Value Award
May 30, 2023News
Dayton Business Journal Top 100 Companies
May 26, 2023Awards
25 °µÍø½ûÇø Employees Volunteer with Habitat for Humanity of Greater Dayton
May 24, 2023Mission
One °µÍø½ûÇø, One Mission Food Drive
May 19, 2023Mission
Stand Down for Safety
May 18, 2023News
Teaching Preble County 4th Graders about Construction
May 17, 2023Mission
°µÍø½ûÇø Construction: Solidly Built on Century of Success
May 16, 2023News
°µÍø½ûÇø's Indianapolis Office Wins CCS Safety Achievement Award
May 12, 2023Awards
New Kenton Ridge PK-12 facility approaching completion
May 11, 2023News
°µÍø½ûÇø's Kenny Bowshier Receives CCS Outstanding Craftsperson Award
May 9, 2023Awards