July 23, 2025 News
We are excited to announce the completion of the Neuse River RRF Sidestream Treatment project for the City of Raleigh, North Carolina! delivered this Bid Package in collaboration with as the CM at Risk. The facilities were necessary to provide sidestream deammonification treatment as part of the overall Bioenergy Recovery Project.
Project features included:
🏗️ Construction of a new 130' X 60' cast-in-place concrete treatment basin with equalization tanks, which houses the diffused aeration equipment, screening equipment, sludge collection equipment, and vertical shaft mixers.
🏗️ A new service building to house the RAS pumps, blowers, and electrical gear.
🏗️ Installation of a filtrate pump station.
🏗️ A new 25’ diameter IFAS clarifier.
🏗️ Site improvements, exposed and underground process piping, and electrical/SCADA upgrades.
We are proud to be a part of updating the region's infrastructure to support its continued growth!
Assembling Beds for Sleep in Heavenly Peace
March 27, 2023Mission
Providing Hands-On Construction Experience at The Big Hoopla STEM Challenge
March 21, 2023Mission
Introducing Construction Trades to Students at Franklin Central HS
March 17, 2023News
Perry Local Schools' New Elementary Schools Project Update
March 16, 2023News
Volunteering with The Foodbank - Dayton
March 13, 2023Mission
Montgomery County SMART Project Update
March 6, 2023News
Laptop Donation to Drink Local. Drink Tap.'s Uganda Team
March 3, 2023Mission
Ski Trip 2023 - Holimont Ski Resort
March 2, 2023Mission
Brookville Reservoir Sign Removal and Replacement
March 1, 2023Mission
Career & Technical Education (CTE) Month - Mid-Atlantic Efforts
February 28, 2023Mission
Take a Look Inside 's Rich History
February 27, 2023News